We have a very long and proud history, with over 50 years experience, we have been involved in the construction of some amazing structures around the world.
1961
2014
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
| 61 | 73 | 76-78 | 78 | 84 | 86 | 87 | 89-90 | 90 | 94 | 94-95 | 95-96 | 96-97 | 98 | 98-99 | 99 | 00 | 00 | 00-01 | 01 | 01 | 01-02 | 02-03 | 04 | 06 | 06 | 06 | 07 | 07 | 08 | 08 | 09 | 10 | 10 | 10 | 11 | 11 | 12 | 12 | 12-13 | 14 | 14 | 14 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Founded | Cable Stayed Footbridge | Sydney Tower | Yokine Water Bowl | Kilawarra Bridge | Rock Engineering Formed | Publicly Listed | Mt Piper Power Station | Kwinana LNG Tanks | Leinster Nickel Mine | Tung Chung Bridges Hong Kong | Wandoo Offshore Platform | Narrows Bridge Strengthening | KCGM Superpit | Emirates Office Tower | Etihad Stadium | Dubai Ring Roads | Argyle Diamond Mine | Narrows Bridge | Canning Dam | Telfer Gold Mine | Stadium Australia | West India Quay | Perth Convention Exhibition Centre | Ownership of Rock Engineering | Eleanor Schonell Bridge | Lake Cowal Gold Mine | ROCK MESHA Launched | First Radar System | Perth-Bunbury Highway | Kooland Island | ROCK Australia | Lady Annie | Catagunya Dam | Mount Rawdon | GFIP South Africa | Saraji Coal Mine | Roseries Dam Sudan | South Middleback Ranges | South Road Superway | Elizabeth Quay Bridge | Edna May Gold Mine | SRG |
| BBR Australia founded in Victoria, undertaking its first project to supply and install BBRV rock anchors for the Snowy Mountain Scheme | Installation and stressing of Cable Stays for a Footbridge Melbourne | Installation of cable stays for this landmark which was the highest structure in the Southern Hemisphere when constructed. | Slipforming of the stem and heavy lifting of 2,000t water bowl 26m. | First incrementally launched bridge project completed in Sydney | Rock Engineering was formed in WA | BBR Australia goes public and is listed on the ASX as Structural Systems Limited | Slipform construction of the 250m tall Mt Piper Chimney in NSW | Design and construction of post-tensioning and slipform systems for three large LNG containment vessels in Kwinana WA. | Commencement of large underground 24/7 ground support contract at Leinster Nickel Mine in WA | Incremental launching of two bridges on the North Lantau Expressway at Chep Lap Kok Airport in Hong Kong | Post-tensioning and slipform construction of the Wandoo ‘B’ Platform | Strengthening of the existing Narrows Bridge in Western Australia using external prestressing. | Commencement of ground support works at the KCGM Superpit in Kalgoorlie WA | Post-tensioning design, installation, stressing and grouting of the 354.6m tall Emirates Office Tower in Dubai. | Design and implementation of heavy lifting for the 1200 tonne roof structure at Etihad Stadium. | Post-tensioning design, installation, stressing and grouting of 13 cast-insitu box girder bridges on the ring road between Al Ain Al Awir Dubai. | Commencement of ground support works at the Argyle Diamond Open Cut Mine in Western Australia. | Incremental launching and post-tensioning of a duplication bridge alongside the existing Narrows Bridge in Western Australia. | Manufacture and installation of 166 of the world’s largest capacity and longest multi-strand ground anchors | Commencement of major ground support contract at the Telfer Gold Mine. | Design, confirguration and automation of 7 lower tier seating segments at Stadium Australia after completion of the 2000 Olympics. | Post-tensioning of the 34 level tower in London’s Docklands. | Lifting of the roof at Perth Convention Exhibition Centre in Western Australia | Rock Engineering became a wholly owned subsidiary of the Structural Systems Group. | Supply, installation and stressing of strand stay cables on the 520m long bridge in Brisbane. | Commencement of major drilling contract at Lake Cowal Gold Mine in New South Wales. | Launch of the inhouse designed ROCK MESHA System (fully automated roll mesh application). | First Radar system was contracted to Anglo Gold Ashanti at Sunrise Dam Gold Mine. | Multi-strand post-tensioning and incremental launching of four bridges on the Perth to Bunbury Highway. | Commencement of ground support works at Koolan Island Iron Ore Mine in Western Australia. | ROCK Engineering changed their name to ROCK Australia Mining and Civil and rebranded. | Awarded first drill and blast contract at Lady Annie Copper Mine in Queensland. | Manufacture and installation of world record capacity multi-strand ground anchors | Commencement of large drilling contract at Mount Rawdon Gold Mine in Queensland. | Supply and installation of multi-strand post-tensioning and incremental launching of the first major project in South Africa for the Group. | Commencement of drilling contract utilising our largest rigs in our fleet at the Saraji Coal Mine in Queensland. | Manufacture, transport, install, grout, stress, monitor and cap 806, 1206 and 5506 permanent anchors at the Roseries Dam located in the Republic of Sudan. | Commencement of drill and blast works at South Middleback Ranges in Whyalla, South Australia. | Transverse post-tensioning of precast segments and post-tensioning in the tie-beam of piers for the 2.8km elevated structure in Adelaide | Award of contract to construct the unique pedestrian bridge at Elizabeth Quay in Perth as part of the DASSH JV. | Commencement of drilling works on site at Edna May Gold Mine in Western Australia. | On the 19th November 2014, Structural Systems Group and ROCK Australia became one unified company, SRG Limited. |